Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing Plant

Product Details
Customization: Available
Type: Hydrocyclone
Voltage: N/a
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Year of Establishment
2012-07-05
Management System Certification
Others
  • Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing Plant
  • Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing Plant
  • Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing Plant
  • Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing Plant
  • Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing Plant
  • Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing Plant
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Application
  • Other Lab Mining Equipment
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
FX Series
Material
Steel & Polyurethane
Material Feature
Durable Use
Certification
ISO9001:2008, CE, SGS
Energy Saving
Energy Saving
Warranty
2 Years
Color
Multi Color
Customized
Non-Customized
Condition
New
After-sales Service
Engineer Guidance/Video Guidance
Usage
Grading Separating The Ore Pulp
Transport Package
Export Packing Standard
Specification
Differ from different models
Trademark
Gelin
Origin
China
Production Capacity
2000 Sets/Month

Product Description

Product Description

Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing Plant

 Hydrocyclone/Centrifugal Cleaner is a kind of equipment used for grading the ore pulp by using centrifugal force. Lacking of motion and power unit, it needs to match with relevant slurry pump. It is mainly used in ore dressing industries for grading, separating, concentrating and desliming.Sometimes the equipment works with dewatering screen for perfect performance.Our Gelin Provides Different types for meeting all customer's requirements.

Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing Plant
 
Features                                                                                                                                                   
1.Simple structure: light and nimble, no moving part;
2.Easy installation, operation, and maintenance;
3.Large processing capacity of unit volume;
4.Low investment, long service life;
 

Product Parameters

Model Interior Dia.(mm) Cone Angle
(°)
Overall
Pipe Dia
(mm)
Feeding Size (mm) Feeding Pressure (Mpa) Processing Capacity
(m3/h)
Range
(um)
Dimensions
(L*W*H) (mm)
Weight
(kg)
FX660 660 20 180-240 16 0.03-0.2 250-350 74-220 1250*890*2650 995
FX500 500 20 130-200 10 0.03-0.3 140-220 74-200 850*790*2050 540
15 74-150 850*790*2380 540
FX350 350 20 80-120 6 0.04-0.3 60-100 50-150 775*605*1765 230
15 50-120 775*605*2115 230
FX300 300 20 65-115 5 0.04-0.3 45-85 50-150 665*585*1310 108
15 40-100 665*585*1505 108
FX250 250 20 60-100 3 0.06-0.35 40-60 40-100 540*480*1180 72
15 40-100 540*480*1220 72
10 30-100 540*480*1380 72
FX200 200 20 40-65 2 0.06-0.35 25-40 40-100 435*360*1050 60
15 30-100 435*360*1115 60
10 30-100 435*360*1205 60
FX150 150 20 30-45 1.5 0.06-0.35 11-20 30-74 280*295*690 22
15 30-74 280*295*900 22
8 30-74 280*295*1270 22
FX125 125 17 25-40 1 0.06-0.35 8-15 20-100 210*185*620 12
8 20-74 250*240*985 12
FX100 100 20 20-40 1 0.06-0.35 5-12 20-100 260*210*525 8
15 20-100 268*215*720 8
8 20-100 268*215*100 8
FX75 75 15 15-22 0.6 0.1-0.4 2-5 20-74 240*230*465 7
6 5-40 240*230*800 7
FX50 50 15 11-16 0.3 0.1-0.4 1-2 10-74 160*155*350 2
6 5-30 160*155*590 2
       
Structure and Working Principle
Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing Plant
Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing Plant
 
The hydrocyclone consists of a hollow cylinder at the top and an inverted cone at the bottom, which is connected to the cylinder to form the hydrocyclone. In addition, the hydrocyclone also has feed pipes, overflow pipes, overflow conduits and sinks. The hydrocyclone pump (or height difference) rotates the slurry into the cylinder along the Tangent Direction with a certain pressure (generally 0.5 ~ 2.5 kg/cm) and flow rate (about 5 ~ 12 m / s) , and then the slurry rotates along the cylinder wall at a very fast speed to create centrifugal force. Under the action of Centrifugal Force and gravity, the coarse and heavy ore particles are thrown out.

The suspension enters the hydrocyclone at a relatively high speed from the feed tube in a tangential direction and rotates from top to bottom. This motion is commonly referred to as external or descending swirl motion. The solid particles in the external swirl flow are separated from the suspension by Centrifugal Force and move down the wall of the device to discharge from the bottom outlet.

Detailed Photos

Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing Plant

Application

Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing Plant

Other Lab Mining Equipment

Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing Plant

Company Profile

Ganzhou Gelin Mining Machinery Co., Ltd is an over 30 years professional manufacturer and exporter of mining machinery for crushing, screening, grinding, flotation, magnetic/gravity separation etc. in China.the machines are excellent for processing gold,diamond,iron ore, ilmenite, manganese ore etc. Gelin have a complete service system which can provide customer full service in mining field and after sales service.By now, Gelin's equipments and services are exported to over 60 countries,include America, Russia, India, Africa, Brazil, Chile,South Africa,Zambia etc. Sincerely welcome to visit our factory.

Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing PlantCustomer Visiting
Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing PlantOur Services


One Stop solution for beneficiation plant service:
1.Engineering consulting available,it makes clients have a comprehensive understanding of beneficiation plant,including mine value,useful elements,mineral processing technology,plant scale,essential equipments,etc.
 
2.Arrange mineral beneficiation experiment after received the material sample and beneficiation test report will be done after test.

3.After reaching agreement with client,we start to engineering design,including planning,investigation,data collection, project evaluation etc. and then comes up with design scheme of beneficiation plant construction and working drawings.
 
4.Manufacturing the necessary equipments and arrange the shipment.
 
5.Complete services for Installation and commissioning and technical training(operating training,common problem solving training).
 
After-sale Service
Regularly visit customers to provide after- sale technical supports and to solve problems of beneficiation plant. For equipments supplied,we could provide one-year warranty and provide spare parts with preferential price in the long term and be responsible for any problems with the them.

FAQ

Q: Are you a trading company or a factory?
A: We are a factory at Shicheng county with 110 workers,6 workshops covered 17,000m2 and office covered 2,500m2. Welcome to visit our factory at anytime.
 
Q: What is your payment terms?
A: By TT(Telegraphic Transfer), 100% or 40% Deposit before production and 60% balance payment paid off before loading from factory.

Q: How long is the guarantee period of your products?
A: The guarantee period is 1-2 years, pls ask staff for more details. And we will supply lifelong technical support service and the spare parts at lowest cost.
 
Q: Is it possible to produce customized products ?
A: Yes, most of our products are produced as required.
 
Q: Is it possible to provide sample for your factory to do ore-dressing experiment?
A: Yes, engineering consulting is available and we'd like to arrange mineral beneficiation experiment after received your sample and provide the test report.

Ball Mill Circuit Hydrocyclone Cluster for Mineral Processing Plant

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier