Factory Price Rock Gold Extraction Plant Full Set Turnkey EPC Project Manufacturer Nigeria
1.Our factory is the leading mining equipments manufacturer who have over 30 years experience in mining field.
We produce full sets mining equipments for processing and separating gold, copper, tin, iron, zircon, rutile, monazite, tungsten, cassiterite, chrome, coltan, manganese, ilmenite, tantalum, niobium, barite and so on.
Main equipments include Trommel, Rotary scrubber, Jig machine, Spiral chute, Shaking table, Magnetic separator, Electrostatic separator, Jaw crusher, Ball mill, Hammer crusher, Double roller crusher, Vibrating screen, Mercury amalgamation, Gold smelting furnace, Diamond washing machine, Gold pan, Drier machine and so on.
| Our factory produce complete mining plants for different minerals separation |
| Coltan |
Diamond |
Zircon sand |
| Tantalum |
River sand gold |
Titanium |
| Cobalt |
Alluvial gold |
Tin /Cassiterite |
| Tungsten |
Rock stone gold |
Heavy minerals sand |
| Tantalite |
placer gold |
Chromium ore |
| Silica sand |
Gold tailing |
Monazite |
| Copper |
Clay gold mining |
Tungsten ore |
| Barite |
Desert sand gold |
llmenite |
| Chrome |
Quartz |
Wolfram ore |
| Iron ore |
Coal |
Niobium |
| Manganese ore |
Sand gravel |
Rutile |
| Fluorite |
Topsoil |
Hematite |
Summary:
Gold ore processing varies by deposit type:
1)alluvial gold with clay, where clay coats gold particles and cements gravel; it requires scrubbing and desliming to liberate the gold, followed by gravity separation (e.g., trommel, sluice box, shaking table). For alluvial gold without clay, the recovery method is similar-only the scrubbing and desliming steps are omitted.
2)river sand gold, which typically contains no clay and has fully liberated gold particles; simple gravity methods such as portable sluice boxes, spiral chutes, or centrifugal concentrators work efficiently.
3)rock stone quartz gold, where gold is locked within solid quartz ore. It must be crushed and ground to liberate the gold, then processed by flotation (for sulfide-associated gold) or cyanidation (e.g., CIP/CIL for free-milling oxidized ore). Refractory ores may require pre-treatment such as roasting or bio-oxidation.
Clay Alluvial Gold Washing plant

Processing Steps
Clay alluvial gold ore is first fed into a rotary scrubber trommel, where intense scrubbing and screening remove clay and reject coarse waste. The undersize material then passes through a vibrating screen for further classification, followed by a first sluice box for roughing. The rough concentrate is sent to a mixing tank for slurry conditioning, then to a second sluice box for cleaning. The cleaned concentrate is subsequently processed by a centrifugal concentrator and a shaking table for fine gold recovery. Finally, amalgamation is applied to extract the gold, and the obtained gold is smelted into gold bars in a gold smelt furnace.
Alluvial Gold Washing plant
Processing Steps
Alluvial gold ore is first fed into a trommel for washing and screening. The undersize material is then conveyed by a belt conveyor to a rougher jigger (processing <10mm material) for roughing. The rougher concentrate goes to a clean jigger for secondary cleaning, while the rougher tailings are sent to a sluice box to recover residual gold. The sluice concentrate, combined with the jigger concentrates, is further upgraded on a shaking table, then passes through a magnetic separator to remove magnetic impurities, followed by amalgamation to extract the gold. Finally, the gold is smelted into pure gold bars in a gold smelt furnace.
PS:jig machines will be replaced by centrifugal concentrator according to mining condition and customer's requirement.
The basically main machines matching are as below accoring to different mining condition:
a). Washing trommel+Centrifugal concentrator+Shaking table;
b). Washing trommel+Jig machine(Jigger)+Shaking table;
c). Washing trommel+Sluice box with grass mat(carpet).
Rock Gold Processing plant
Processing Steps
Rock gold ore evenly fed by a feeder into a jaw crusher for primary crushing, then into a hammer crusher for secondary fine crushing. The crushed material enters a ball mill for grinding to liberation size. After grinding, the material is processed in two alternative routes: Option 1 goes directly to a shaking table for concentration to obtain gold concentrate; Option 2 first goes to a jig machine for roughing, and the rougher concentrate is then further upgraded on a shaking table to produce final gold concentrate.
Each client's Kaolin processing and recovery requirements are unique. We design customized processing flowcharts based on each client's specific mining conditions. For a detailed processing flowchart, please do not hesitate to contact us!
Successful Case
150T/H alluvail gold processing plant at Cote D'ivoire
Location:Cote Divoire,Africa The services we provided:
1.Pre-project mining consulting
2.Design whole plant flowchart, Provide Plant layout and Foundation Drawing
3.Provide Complete Set of Processing plant equipments(Trommel screen,jig machine,shaking table,sluice box,belt conveyor, feed hopper)
4.Shipping all machines to D'ivoire
5.Provide technical support & installation instructions.
An africa customer is planning to build a small alluvial gold processing production line. After the joint efforts of our business and engineering team, we successfully help the customer build a 150-ton per hour alluvial gold washing and screening production plant.
The design of this project is simple and the selected equipment is mature and stable. all of the products are provide by Gelin, After 18 working days of production in the Chinese factory, it is delivered on time. The post-installation and commissioning work progressed smoothly. It was successfully put into operation at the end of November, final gold content rate satisfies the needs of customer.

300T/H alluvial diamond washing plant in Liberia
Location: Liberia,West Africa.
Mining condition: Clay alluvial diamond mine The services we provided:
1.Pre-project mining consulting
2.Design whole plant flowchart, Provide Plant layout and Foundation Drawing
3.Provide Complete Set of Processing plant equipments(Trommel screen,jig machine,shaking table,sluice box,water pump, rotary scrubber, feeder hopper, vibrating feeder)
4.Shipping all machines to Liberia
5.Provide technical support & installation instructions
Besic Steps:
Raw ore is first stored in a feed hopper, then evenly fed by a vibrating feeder, where material larger than 70mm is screened out and directly discarded as tailings. The remaining material enters a rotary scrubber, where intense scrubbing removes clay and impurities.
The washed ore then enters a trommel for screening, which separates the material into three size fractions: 10-50mm, 2-10mm, and ≤2mm. These three fractions are transferred by belt conveyors to their respective jig machines: the 10-50mm material goes to a jig machine with ore discharge on screen type for roughing; the 2-10mm and ≤2mm materials each go to their respective jig machines with ore discharge under screen type for roughing.
The rough concentrates produced by each jig are then sent to corresponding cleaning jig machines (with 10mm screen and 2mm screen) for secondary enrichment. Additionally, material sized 50-70mm (separated from the trommel) goes to a color sorting machine (or manual sorting) for diamond extraction. Finally, all cleaned concentrates enter a shaking table, where further separation by density produces diamond concentrates and other concentrates. Throughout the process, belt conveyors are used to transfer materials between equipment.

Product Description

5.Packing & Delivery

6.About Us
Ganzhou Gelin Mining Machinery Company Limited is an expert manufacturing mining machines in China. Our company is located in the Industrial Zone of Shicheng County, Jiangxi Province.
Our distinctive products include Shaking table, Jig, Spiral separator, Gold concentrator, Ball mill, Jaw crusher, flotation, magnetic separator, Feeder, Classifier, ore washing machine and lab equipment etc. Our machines are popular in separating gold, copper, manganese, chrome, tungsten, tin, nickel, iron, titanium, lead, zinc, tantalum and some non-ferrous metals like quart, zircon, barite, etc.
Our products are sold to more than 28 provinces/cities in China and are exported to Russia, Africa, India, the Middle East, the Philippines, Mongolia, Sudan, Kazakhstan, Brazil, America, Canada and Australia. We have won high reputations from all of our clients for our machines and services.
Besides the above mentioned products, we can also design and manufacture many kinds of special mining machines and automatic processing lines according to the requests of customers. If you are in need of detailed information, please inform us. We will provide you with total solutions according to your specific requirements in time.
7.GELIN Services
--- PRE-SALE SERVICE ---
1.Based on clients' request and budget, GELIN experts will strictly make efficient, reliable solutions accordingly;
2.Mine sample testing is available, we welcome the customer send the sample to you for testing by courier, or, the customer take the sample to our factory for testing;
3. Design and provide the complete processing flowchart;
4. Design & manufacturer products according to clients' demands.
--- AFTER-SALE SERVICE ---
1.Pre-check and test the products before delivery;
2.Deliver the whole plant design for our clients which including infrastructure, electrical system and pipeline system design;
3.Trace the status of the shipping until the products received;
4.Prepare required documents to let clients pass custom clearance;
5.Dispatch experts to carry out below service on site:
1) Installation & debug of the machinery
2) Train the first-line operators & technical personnel
3) Carry out any other service clients may need
6. Provide technical exchanging & spare parts for life-long term
--- ONE STOP SOLUTION ---
1.Starting by running the mineral beneficiation experiment. To provide our clients with the best solution accordingly;
2.Besides supply the flowchart design & equipment, we also provide the infrastructure design; Electrical & pipeline system design, etc. To help our clients complete the design of the whole plant;
3.After the installation, debugging of the equipment, the official production will also be guiding by our experienced engineers on site, to guarantee the output minerals perfectly meet your demands.
8.Certificate
9.Customer Visiting
10.FAQ
Q: How big is your factory?
A: In tolal 6 work shops,17,000m², office 2500 m², 110 workers.
Q: What Information should customers give to us in order to let we provide you with efficient & suitable quotation and assistance.
A:1). What type is the mining? Is it rock stone? or it is sand?
2). If rock stone,What is the general particle size(mm) of the raw ore?
3). What is the handling capacity(tons per hour) you plan to work with?
4).What is the elements of the raw ore? How much percent % of each minerals?
Q: Can we send the mineral samples to your company, let your company run the ore-dressing experiments test for us?
A: Yes, we can run the ore-dressing experiments for our customers. After the test, we will based on the results to give you the reasonable flowchart, suitable solution and equipments selection. etc.
Q: How long is the warrenty of your equipments? Does your company supply the spare parts?
A: The warranty period of Gelin equipments is one year. And of course we will supply the spare parts for you for life-long time at lowest cost.
Q: If i need the complete mineral processing line. is Gelin able to help us build it?
A: Yes, we can help you combine a complete mineral processing line. and give you related professional advices as long as you need.
There is a rich experience engineer team of us. we had already build many mining projects in China & Overseas. You can believe our quality and service.

Welcome you visit our factory in your free time!