• Full Sets Tailing Rock Gold CIP System Leaching Plant
  • Full Sets Tailing Rock Gold CIP System Leaching Plant
  • Full Sets Tailing Rock Gold CIP System Leaching Plant
  • Full Sets Tailing Rock Gold CIP System Leaching Plant
  • Full Sets Tailing Rock Gold CIP System Leaching Plant
  • Full Sets Tailing Rock Gold CIP System Leaching Plant

Full Sets Tailing Rock Gold CIP System Leaching Plant

Type: Mineral Processing & Screening Equipment
Voltage: 220/380V/440V
Weight: 5T
Material: Steel
Certification: ISO9001:2008, CE
Energy Saving: Energy Saving
Customization:
Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
Rock gold processing plant
Warranty
2 Years
Customized
Customized
Condition
New
After-sales Service
Engineer Guidance/Video Guidance
Usage
Gold & Diamond Wash and Separate
Feeding Density
30%~50%
After Service
Engineers Come to Mining Site Install Equipments
Transport Package
Export Packing Standard
Trademark
Gelin
Origin
China
HS Code
8474100000
Production Capacity
100sets Per Month

Product Description

Full Sets Tailing Rock Gold CIP System Leaching Plant

Our factory are professional in producing CIP/CIL related equipments, jaw crusher, ball mill, agitating tank, gold smelting frunace, gold washing trommel, rotary scrubber, vibrating screen and other type mining equipment.

Product application

1) Rock gold mining
2) Tailing gold

CIP processing flowchart:
Full Sets Tailing Rock Gold CIP System Leaching Plant
The carbon slurry gold extraction process(CIP)is one of the methods for cyanide gold extraction. After the cyanide leaching of the gold containing material is completed, the gold-containing cyanide is subjected to carbon adsorption. It has long been found that activated carbon can adsorb precious metals from a solution, and initially only adsorbs gold from the supernatant, and smelts the gold-bearing charcoal to recover gold.

Full Sets Tailing Rock Gold CIP System Leaching Plant
In the CIL (Carbon in Leach) or CIP (Carbon in Pulp) plants while the precious metals are being dissolved by the cyanide solution in the large volume tanks the dissolved metals are adsorbed by the active carbon. These processes are generally preferred for the relatively high grade and lower reserve ore types with very fine graded precious metals.
The major difference between the CIL and CIP processes is; during the CIL process both cyanide leaching and carbon adsorption take place in the same tanks but in the CIP process first leaching occurs in the first couple of tanks then carbon adsorption take place in the following tanks while leaching continues. In all of these tanks agitation and air sparging is available.

Full Sets Tailing Rock Gold CIP System Leaching PlantFull Sets Tailing Rock Gold CIP System Leaching Plant

Jaw Crusher
Jaw crusher is used for crush the big stones into small pieces.

Specification

Model No. Feed
Opening
(mm)
Max.
Feeding
Size
(mm)
Adjusting
Range Of
Discharge
Opening
(mm)
Capacity
(t/h)
Rotation
Speed Of
Eccentric
Shaft
(r/min)
Motor
Power
(KW)
Total
Weight
(t)
Dimensions
(mm)
PE-200*300 200*300 180 15-50 2-6 260 7.5 1 910*750*990
PE-200*350 200*350 180 18-70 3-10 260 11 1.3 1000*870*990
PE-250*400 250*400 210 20-60 5-20 300 15 2.8 1300*1090*1270
PE-400*600 400*600 340 40-100 16-60 275 30 7 1730*1730*1630
PE-500*750 500*750 425 50-100 40-110 275 55 12 1980*2080*1870
PE-600*900 600*900 500 75-200 60-200 250 75 20 2290*2290*2400
PE-750*1060 750*1060 630 80-140 115-330 250 110 29 2660*2430*2800
PE-870*1060 870*1060 660 200-260 290-336 250 110 31.5 2810*2430*2800
PE-900*1060 900*1060 685 230-290 160-400 250 110 33 2870*2420*2940
PE-900*1200 900*1200 750 95-165 220-450 200 110 52 3380*2870*3330
PE-1000*1200 1000*1200 850 195-265 315-500 200 110 55 3480*3876*3330
PE-1200*1500 1200*1500 1020 150-300 400-800 180 160 100.9 4200*3300*3500
PEX-150*750 150*750 120 18-48 8-25 320 15 3.8 1200*1530*1060
PEX-250*750 250*750 210 25-60 13-35 330 30 5.5 1380*1750*1540
PEX-250*1000 250*1000 210 25-60 16-52 330 37 7 1560*1950*1390
PEX-250*1200 250*1200 210 25-60 20-61 330 45 8.5 2140*1660*1500
PEX-300*1300 300*1300 250 20-90 16-105 300 75 11 2720*1950*1600

Full Sets Tailing Rock Gold CIP System Leaching Plant
Ball Mill

The ball mill is a key equipment to grind the crushed materials, and the ball mill is widely used in powder-making production line including cement, silicate, new-type building material, refractory material, fertilizer, ore dressing of ferrous metal and non-ferrous metal, glass ceramics, etc, and the ball mill can grind various ores and other materials with dry type and wet type. There are two kinds of ball mill, grate type and overfall type due to different ways of discharging material.
The ball mill is a horizontal rotating device transmitted by the outer gear. The materials are transferred to the grinding chamber through the quill shaft uniformly. There are ladder liner and ripple liner and different specifications of steel balls in the chamber. The centrifugal force caused by rotation of barrel brings the steel balls to a certain height and impact and grind the materials. The ground materials are discharged through the discharging board thus the grinding process is finished.


Specification:

Model Shell rotation speed
(r/min)
Ball load
(t)
Feeding size
(mm)
Discharging size
(mm)
Capacity
(t/h)
Motor power
(kw)
Weight
(t)
Ø600*1200 20~36 0.5 <=20 0.074-0.4 0.2~1 7.5 1.6
Ø900*1800 36-38 1.5 <=20 0.075-0.89 0.65-2 18.5 4.6
Ø900*3000 36 2.7 <=20 0.075-0.89 1.1-3.5 22 5.6
Ø1200*2400 36 3 <=25 0.075-0.6 1.5-4.8 30 12
Ø1200*3000 36 3.5 <=25 0.074-0.4 1.6-5 37 12.8
Ø1200*4500 32.4 5 <=25 0.074-0.4 1.6-5.8 55 13.8
Ø1500*3000 29.7 7.5 <=25 0.074-0.4 2-5 75 15.6
Ø1500*4500 27 11 <=25 0.074-0.4 3-6 110 21
Ø1500*5700 28 12 <=25 0.074-0.4 3.5-6 130 24.7
Ø1830*3000 25.4 11 <=25 0.074-0.4 4-10 130 28
Ø1830*4500 25.4 15 <=25 0.074-0.4 4.5-12 155 32
Ø1830*6400 24.1 21 <=25 0.074-0.4 6.5-15 210 34
Ø1830*7000 24.1 23 <=25 0.074-0.4 7.5-17 245 36
Ø2100*3000 23.7 15 <=25 0.074-0.4 6.5-36 155 34
Ø2100*4500 23.7 24 <=25 0.074-0.4 8-43 245 42
Ø2100*7000 23.7 26 <=25 0.074-0.4 8-48 280 50
Ø2200*4500 21.5 27 <=25 0.074-0.4 9-45 280 48.5
Ø2200*6500 21.7 35 <=25 0.074-0.4 14-26 380 52.8
Ø2200*7000 21.7 35 <=25 0.074-0.4 15-28 380 54
Ø2200*7500 21.7 35 <=25 0.074-0.4 15-30 380 56
Ø2400*3000 21 23 <=25 0.074-0.4 7-50 245 54
Ø2400*4500 21 30 <=25 0.074-0.4 8.5-60 320 65
Ø2700*4000 20.7 40 <=25 0.074-0.4 12-80 400 94
Ø2700*4500 20.7 48 <=25 0.074-0.4 12-90 430 102
Ø3200*4500 18 65 <=25 0.074-0.4 ----- 800 137

Full Sets Tailing Rock Gold CIP System Leaching Plant
Agitating Tank


Agitating tank Stirred tank for a variety of metal ores, mainly for pre-mixing flotation, are pharmaceutical products, with the well-mixed slurry can also be used for other non-metallic mineral mixing. It is used in concentrations of not more than 30% (by weight) a fixed component of the particle size is less than 1mm. It is a flat-bottomed bucket of radiation in the form of circular screw-type impeller mechanical agitation. Triangle by the electric motor rotating impeller rotation, will be full of drugs and pulp mixture to increase the role of the mineral reactions pharmaceutical and strengthen drug reactions necessary equipment. This machine is mainly used for the election mining, is also used as mixing chemical ingredients

Specification:

Products
Name
Model Effective
Volume
M3
Tank size Impeller Motor
Power(kw)
Weight(kg)
ID(mm) Height(mm) Diameter(mm) Rpm(r/min)
Mine
With
Stir
Mix
Slot
XB-500 0.124 500 500 150 1000 1.5 0.468
XB-1000 0.58 1000 1000 250 530 1.5 0.531
XB-1500 2.2 1500 1500 400 340 3 0.816
XB-1600 2.8 1600 1600 400 320 5.5 1.1
XB-2000 5.6 2000 2000 550 290 11 1.5
XB-2500 11.2 2500 2500 650 275 15 3.4
XB-3000 19 3000 3000 750 250 22 5.19
XB-3550 31.5 3550 3550 850 230 30 7.28
XB-4000 45 4000 4000 1000 210 37 12.51
New
Type
Stir
Mix
Slot
RJ-1000
RJW-1000
0.7 1000 1000 250 610 1.5 0.532
RJ-1250
RJW-1250
1.4 1250 1250 310 492 2.2 0.685
RJ-1600
RJW-1600
2.8 1600 1600 400 305 4 1.168
RJ-2000
RJW-2000
5.6 2000 2000 500 282 7.5 2.205
RJ-2500
RJW-2500
11.2 2500 2500 625 244 11 3.497
RJ-3150
RJW-3150
22 3150 3150 788 194 15 4.648
RJ-3550
RJW-3550
31.5 3550 3550 888 172 18.5 7.074
RJ-4000
RJW-4000
45 4000 4000 1000 153 1.1 8.918

Full Sets Tailing Rock Gold CIP System Leaching Plant
Large process capacity CNC Jig

Feeding size: can handle any -30mm materials(<30mm).
Process capacity:30 tons per hour per set.
CNC adjust stroke and frequency, it is easy to handle the process speed and capacity.
Three chambers per set with only one piece 7.5kw electric motor, less electric consumption!
Full Sets Tailing Rock Gold CIP System Leaching Plant
Specification of traditional sawtooth wave jig

Model Chamber Maximum
Feeding
size(mm)
Water
added
m3/t
Pressure
of water
Mpa
Capacity
t/h
Motor
power
kw
Dimension
mm
Weight
kg
shape area(m2)
JT0.57-1 Ladder 0.57 6 1-3 >=0.5 1-2.5 1.5 1550x780x1530 610
JT1-1 Ladder 1.04 10 1-3 2-4 2.2 2270x1110x1890 900
JT1.5-2 Rect 1.53 10 1-2 3-8 3 3200x1550x2050 1520
JT2-2 Rect 2.28 10 1-3 4-8 3 3225x1550x2050 1640
JT3-1 Ladder 3.3 10 1-3 6-10 5.5 3180x2000x2600 3260
JT4-2 Rect 4.33 30 1-3 10-15 7.5 3600x1850x2600 4600
JT5-2 Ladder 4.86 10 1-3 10-15 7.5 3600x2000x2600 4500
JT1.5-2S Rect 1.53 30 1-3 3-8 1.5x2 3200x1550x2050 1590
JT2-2S Rect 2.28 30 1-3 4-8 3x2 3225x1550x2050 1700
JT3-2S Rect 3 30 1-3 6-15 5.5x2 3560x2030x2600 3260
JT4-2S Rect 4.33 30 1-3 10-20 4x2 3600x1850x2600 4660
JT5-2S Ladder 4.86 30 1-3 10-20 5.5x2 3600x2000x2600 4700
JT6-3S Rect 6 30 1-3 15-30 7.5x2 4600x2000x2600 5900

Shaking table
Which is also called table concentrator, is a mine separation device for fine minerals working by gravity. They are effective in processing precious and base metal, rare metal and non-metallic minerals, widely used in separation for Gold, Silver, Tin, Columbium, Tantalum, Titanium, Barium, Tungsten, Iron, Chrome, Manganese, Zircon, Lead, Zinc, Mercury, Copper, Aluminum, etc.

Model 6S-7.6 6S-4.08 6S-1.95 6S-0.5
Deck type Coarse ore deck Fine sand deck Slime deck
Benefication Area(m2) 7.6 7.6 7.6 4.08 1.95 0.5
Deck size Length(mm) 4450 4450 4450 3000 2100 1100
Transmission end width (mm) 1855 1855 1855 1320 1050 500
Concentrate end width (mm) 1546 1546 1546 1100 850 430
Maximum feeding size(mm) 2 0.5 0.15 Sand -2 Sand -2 Sand -2
Slime-0.1 Slime-0.074 Slime-0.074
Feeding amount 0.8-1.5ton/h 0.8-1.5ton/h 0.8-1.5ton/h 0.4-1.5t/h 0.3-0.8t/h 0.05-0.2t/h
Feeding density(%) 25-30 20-25 15-25 10-30
Stroke(mm) 16-22 11-16 8-16 6-30 12-28 9-17
Frequency(F) 45-220 53-250 60-280 210-320 250-450 280-460
Water added 1-3t/h 1-3t/h 1-3t/h 0.4-2t/h 0.2-1t/h 0.1-0.5t/h
Transverse slope of deck 2°30-4°30 1°30-3°30 1°-2° 0-10° 0-8° 0-10°
Longitudinal slope of deck 1.4 0.92 --- --- --- ---
Cross-section shape of deck rectangular saw-tooth triangle --- --- ---
Motor power(kw) 1.1 0.55
Transmission mechanism Eccentric linkage

Full Sets Tailing Rock Gold CIP System Leaching Plant
Our company & Customers Visiting

Ganzhou Gelin Mining Machinery Co., Ltd is an expert manufacturer of mining machines in China. Our company is located in Guzhang Industrial Zone, Shicheng county, Jiangxi province, covering an area of over 30000 square meters, having more than 30 sets of heavy processing equipment and with an annual outpurt of more than 2000 sets of mining machinery.
Full Sets Tailing Rock Gold CIP System Leaching Plant

--- PRE-SALE SERVICE ---

1.Based on clients' request and budget, GELIN experts will strictly make efficient, reliable solutions accordingly;
2.Mine sample testing is available, we welcome the customer send the sample to you for testing by courier, or, the customer take the sample to our factory for testing;
3. Design and provide the complete processing flowchart;
4. Design & manufacturer products according to clients' demands.

--- AFTER-SALE SERVICE ---

1.Pre-check and test the products before delivery;
2.Deliver the whole plant design for our clients which including infrastructure, electrical system and pipeline system design;
3.Trace the status of the shipping until the products received;
4.Prepare required documents to let clients pass custom clearance;
5.Dispatch experts to carry out below service on site:
1) Installation & debug of the machinery
2) Train the first-line operators & technical personnel
3) Carry out any other service clients may need
6. Provide technical exchanging & spare parts for life-long term

--- ONE STOP SOLUTION ---

1.Starting by running the mineral beneficiation experiment. To provide our clients with the best solution accordingly;
2.Besides supply the flowchart design & equipment, we also provide the infrastructure design; Electrical & pipeline system design, etc. To help our clients complete the design of the whole plant;
3.After the installation, debugging of the equipment, the official production will also be guiding by our experienced engineers on site, to guarantee the output minerals perfectly meet your demands.

Full Sets Tailing Rock Gold CIP System Leaching Plant
FAQ

Q: What Information should customers give to us in order to let we provide you with efficient & suitable quotation and assistance.

A:1). What type is the mining? Is it rock stone? or it is sand?
2). If rock stone,What is the general particle size(mm) of the raw ore?
3). What is the handling capacity(tons per hour) you plan to work with?
4).What is the elements of the raw ore? How much percent % of each minerals?

Q: Can we send the mineral samples to your company, let your company run the ore-dressing experiments test for us?

A: Yes, we can run the ore-dressing experiments for our customers. After the test, we will based on the results to give you the reasonable flowchart, suitable solution and equipments selection. etc.

Q: How long is the warrenty of your equipments? Does your company supply the spare parts?

A: The warranty period of Gelin equipments is one year. And of course we will supply the spare parts for you for life-long time at lowest cost.

Q: If i need the complete mineral processing line. is Gelin able to help us build it?

A: Yes, we can help you combine a complete mineral processing line. and give you related professional advices as long as you need.
There is a rich experience engineer team of us. we had already build many mining projects in China & Overseas. You can believe our quality and service.

Full Sets Tailing Rock Gold CIP System Leaching Plant

Welcome to visit our factory in your free time!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now