• 1200 Wet Pan Grinding Mill for Separating Gold Lead Ore
  • 1200 Wet Pan Grinding Mill for Separating Gold Lead Ore
  • 1200 Wet Pan Grinding Mill for Separating Gold Lead Ore
  • 1200 Wet Pan Grinding Mill for Separating Gold Lead Ore
  • 1200 Wet Pan Grinding Mill for Separating Gold Lead Ore
  • 1200 Wet Pan Grinding Mill for Separating Gold Lead Ore

1200 Wet Pan Grinding Mill for Separating Gold Lead Ore

Type: Wet Pan Mill
Motor Type: AC Motor
Motor Power: 7.5KW
Rotationl Speed: 17-19r/min
Application: Mine
Materials: Gold
Customization:
Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
1200
Condition
New
Warranty
2 Years
After-sales Service
Engineer Guidance/Video Guidance
Brand Name
Gelin
Usage
Mining Concentration
Feeding Size
30mm
Testing
Supply
Transport Package
Nude / Container
Specification
complete
Trademark
GELIN
Origin
China
HS Code
8474202000
Production Capacity
1500sets Per Month

Product Description

1200 Wet Pan Grinding Mill for Separating Gold Lead Ore
 
1200 Wet Pan Grinding Mill for Separating Gold Lead Ore

1.Description

Wet Pan Mill is applied for the material re-crushing after the first crushing which can instead of ball mill. Widely used in gold, iron, molybdenum, lead, zinc, antimony, cement, silicate products, new building materials, refractory materials, chemical fertilizer, black non-ferrous metal processing, such as all kinds of ores and other materials need dry or wet grinding.
Use for gold processing from the hard rock.

Features

1).Less investment.
2).Easy to operation and maintenance.
3).High efficiency and saving power.
4).It can take the place of ball mill because all the materials that ball mill can handle, the wet mill machine can handle as well.
5).The Best price river gold widely used Sudan China wet pan mill for gold is the ideal equipment for small and medium enterprises that are in the field of ore dressing.
6).The wet mill machine made by Z-land, can offer the seal cover to reduce the air pollution.
1200 Wet Pan Grinding Mill for Separating Gold Lead Ore
1200 Wet Pan Grinding Mill for Separating Gold Lead Ore
2.Woking Principle

The motor drives the power to the speed reducer, the central driving shaft pass the torque to the upper horizontal axis, the cause the grinding wheels to drive and rotate clockwise. The grinding wheels rotate around the shaft and axis.

The minerals in the mill is subjected to crushing force and great frictional force from the weight of the grinding wheel, and is thoroughly crushed after repeated crushing, rubbing and grinding. In the course of rolling and kneading the minerals, the grinding wheels also mix the ore pulp with water evenly, so to make the grinding index such as pulp density stable.

After grinding and crushing, the monomer breaks the mineral particles, is brought to the upper surface of the liquid in the stirring frenzy, is discharged through the overflow from the discharging port which is prearranged on the iron pan, and then is processed into the next operation process.

At the same time, the coarse grained minerals settle in the bottom of the pan, to be grind continuously, till it meet the requirement of fineness. The screen on the arranged discharging port can strictly control the gradation granularity, and avoid the phenomenon of over crushing or uneven particle size so to build a good condition of the following operation.
1200 Wet Pan Grinding Mill for Separating Gold Lead Ore
1200 Wet Pan Grinding Mill for Separating Gold Lead Ore



3.Technical Data
 
Model Specification
(mm)
Input size
(mm)
Speed
(r/min)
Motor Power
(kw)
Weight
(T)
1600A 1600*400*200*500±20 30 20-22 25 14.5
1500A 1500*350*200*460±20 30 20-22 22 13.5
1500B 1500*350*150*460±20 30 20-22 22 12.3
1500C 1500*300*150*420±20 30 20-22 22 11.3
1400A 1400*250*150*350±20 30 16-18 18.5 8.5
1400B 1400*250*150*350±20 30 21-23 18.5 8.5
1350A 1350*250*150*350±20 30 16-18 18.5 8
1350B 1350*250*150*350±20 30 21-23 18.5 8
1300A 1300*250*150*350±20 30 16-18 15 7.5
1300B 1300*250*150*350±20 30 21-23 15 7.5
1200A 1200*200*80*250±20 30 17-19 7.5 5.5
1200B 1200*200*80*250±20 30 23-25 7.5 5.5
1100A 1100*200*80*250±20 30 17-19 7.5 5
1100B 1100*200*80*250±20 30 23-25 7.5 5
1000 1000*200*80*250±20 30 13-15 5.5 4.5

4.Application

1200 Wet Pan Grinding Mill for Separating Gold Lead Ore
1200 Wet Pan Grinding Mill for Separating Gold Lead Ore
5.About Us

Ganzhou Gelin Mining Machinery Company Limited is an expert manufacturing mining machines in China. Our company is located in the Industrial Zone of Shicheng County, Jiangxi Province.
1200 Wet Pan Grinding Mill for Separating Gold Lead Ore
Our distinctive products include Shaking table, Jig, Spiral separator, Gold concentrator, Ball mill, Jaw crusher, flotation, magnetic separator, Feeder, Classifier, ore washing machine and lab equipment etc. Our machines are popular in separating gold, copper, manganese, chrome, tungsten, tin, nickel, iron, titanium, lead, zinc, tantalum and some non-ferrous metals like quart, zircon, barite, etc.

Our products are sold to more than 28 provinces/cities in China and are exported to Russia, Africa, India, the Middle East, the Philippines, Mongolia, Sudan, Kazakhstan, Brazil, America, Canada and Australia. We have won high reputations from all of our clients for our machines and services.

Besides the above mentioned products, we can also design and manufacture many kinds of special mining machines and automatic processing lines according to the requests of customers. If you are in need of detailed information, please inform us. We will provide you with total solutions according to your specific requirements in time.

6.GELIN Services

--- PRE-SALE SERVICE ---
1.Based on clients' request and budget, GELIN experts will strictly make efficient, reliable solutions accordingly;
2.Mine sample testing is available, we welcome the customer send the sample to you for testing by courier, or, the customer take the sample to our factory for testing;
3. Design and provide the complete processing flowchart;
4. Design & manufacturer products according to clients' demands.
--- AFTER-SALE SERVICE ---
1.Pre-check and test the products before delivery;
2.Deliver the whole plant design for our clients which including infrastructure, electrical system and pipeline system design;
3.Trace the status of the shipping until the products received;
4.Prepare required documents to let clients pass custom clearance;
5.Dispatch experts to carry out below service on site:
1) Installation & debug of the machinery
2) Train the first-line operators & technical personnel
3) Carry out any other service clients may need
6. Provide technical exchanging & spare parts for life-long term
--- ONE STOP SOLUTION ---
1.Starting by running the mineral beneficiation experiment. To provide our clients with the best solution accordingly;
2.Besides supply the flowchart design & equipment, we also provide the infrastructure design; Electrical & pipeline system design, etc. To help our clients complete the design of the whole plant;
3.After the installation, debugging of the equipment, the official production will also be guiding by our experienced engineers on site, to guarantee the output minerals perfectly meet your demands.

7.Certificate

1200 Wet Pan Grinding Mill for Separating Gold Lead Ore
8.Customer Visiting

1200 Wet Pan Grinding Mill for Separating Gold Lead Ore
9.FAQ

Q:
How big is your factory?

A: In tolal 6 work shops ,17,000m², office 2500,110 workers.

Q: What Information should customers give to us in order to let we provide you with efficient & suitable quotation and assistance.
A:1). What type is the mining? Is it rock stone? or it is sand?
2). If rock stone,What is the general particle size(mm) of the raw ore?
3). What is the handling capacity(tons per hour) you plan to work with?
4).What is the elements of the raw ore? How much percent % of each minerals?

Q: Can we send the mineral samples to your company, let your company run the ore-dressing experiments test for us?
A: Yes, we can run the ore-dressing experiments for our customers. After the test, we will based on the results to give you the reasonable flowchart, suitable solution and equipments selection. etc.

Q: How long is the warrenty of your equipments? Does your company supply the spare parts?
A: The warranty period of Gelin equipments is one year. And of course we will supply the spare parts for you for life-long time at lowest cost.

Q: If i need the complete mineral processing line. is Gelin able to help us build it?
A: Yes, we can help you combine a complete mineral processing line. and give you related professional advices as long as you need.
There is a rich experience engineer team of us. we had already build many mining projects in China & Overseas. You can believe our quality and service.

1200 Wet Pan Grinding Mill for Separating Gold Lead Ore
Welcome you visit our factory in your free time!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now